An Aerojet Rocketdyne RS-25 rocket engine (RS-25 Engine 10001) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 8 June 2023, at 18:16 UTC (13:16 CDT). This was the tenth hot fire test in a planned 12-test series of the newly redesigned RS-25 engines that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, the same amount of time the engines must fire during an actual flight of NASA’s Space Launch System (SLS).
Credit: NASA
#RS25
1 view
55
31
10 years ago 01:44:10 1
Space Launch System SLS RS-25 Test Fire NASA Social