DeepOcean - Spool Installation, Troll Field part 2

Installation of 36” SD Spool from the Edda Freya on the Troll Ph 3 project for Equinor. All drone operations in accordance with Aris requirements Offshore operations, July 2020. • Client: Equinor • Troll Phase 3 – Marine operations 2019 – 2020 • Troll field in the North Sea • Installation vessel Edda Freya • DeepOcean / Troll Phase 3 responsibility to fabricate all three spools
Back to Top