DeepOcean - Spool Installation, Troll Field

Installation of 20” SD Spool from the Edda Freya on the Troll Ph 3 project for Equinor. All drone operations in accordance with Aris requirements Offshore operations, July 2020. • Client: Equinor • Troll Phase 3 – Marine operations 2019 – 2020 • Troll field in the North Sea • Installation vessel Edda Freya • Installation of 20” SD Spool W1. Spool dimensions: 52100 x 15700 x 5200mm, 55Te (in white). Spreader bar dimensions: 55180 x 16086 x 6918mm, 52Te (in yellow). Total weight 106Te. • 2 off additional spools to be installed by Edda Freya on this campaign: o 1 off 36” CS Spool TRA o 1 off 20” SD Spool W1 • DeepOcean / Troll Phase 3 responsibility to fabricate all three spools