This is how I assembled my GEET reactor - Part I .
--------------------------------------------------------------------
1“ outer pipe and 1/2 inner pipe, black seamless steel, with T-Pieces at the ends (1“, 3/4“, 3/4“). The inner pipe goes through both T-pieces.
I have checked the inner and outer pipe magnetic signature before and wrote it on the pipes, to make sure, that I assemble it correctly.
Tube lenghts in this case:
inner tube: 340 mm
outer tube: 200 mm
----------------------------
Edit (September 2nd, 2010):
This reactor might be too short. If you start experimenting with such kind of reactor then make it approx. 75 mm longer than above stated. (inner tube: 415 mm, outer tube: 275 mm)
65 views
0
0
9 years ago 00:03:08 763
Assembling a Rosette
13 years ago 00:04:12 35
Assembling a Wedding Cake
10 years ago 00:01:59 94
Assembling a LECHUZA CUBICO
5 years ago 00:02:36 1
Assembling a Tamper
4 years ago 00:01:16 274
Assembling a Microfarm at The Venus Project
9 years ago 00:03:34 34
Luke assembling a dollhouse
1 year ago 02:40:25 1
Assembling a WattsCraft hull kit
10 years ago 00:09:52 20
Assembling a Clarinet
7 years ago 00:01:29 59
A robot assembling an IKEA chair - Francisco Suárez-Ruiz, Science Robotics