Tower 2 Module 6 was lifted and stacked before the CC 8800-1 crane was lowered to be reconfigured for subsequent lifts. Meanwhile, one of Ship 30’s Raptor Vacuum engines was replaced ahead of an anticipated additional static fire test.
🔗 NSF Store:
⚡ Become a member of NASASpaceflight’s channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
🎥 Video from Mary (@BocaChicaGal) and Starbase Live.
✂️ Edited by Thomas (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy:
L2 Boca Chica (more clips and photos) from BC’s very early days to today.
🔗
(Join L2 and support NSF here: https