#247
Here we are on another installation of a sewage system.
I didn’t plan to film this installation, but when it’s a blasting day, I have to turn on the camera :)
We blast space for tank #1 and a channel for the pipes from the old system to the new pit.
This job was done on a Friday.
I don’t dig out the pit to avoid having unnecessarily deep shafts open over the weekend.
Excavator: Cat 313FL with a Engcon EC219 integrated grab QS60GR20
Camera: GoPro Black 7
Video Editing: iMovie
Location: Sweden
Instagram: m_hedblom
Mail: hedblomproduction@
Bladhs Sprängservice AB: